কনটেন্টটি শেষ হাল-নাগাদ করা হয়েছে: রবিবার, ১ ফেব্রুয়ারী, ২০২৬ এ ০৪:১৮ PM
কন্টেন্ট: পাতা
| Name of the Factory | Ghorashal Polash Fertilizer PLC (GPFPLC) |
| Location of the Factory | Polash, Narsingdi. |
| Factory Area | 110 Acres |
| Production Capacity | 2800 MTPD (9,24,000 MTPY) |
| Implementation Period | October, 2018 - June, 2024 |
| Name of General Contractor | Mitsubishi Heavy Industries Limited (MHI), Japan and China National Chemical Engineering No. 7 Construction Co. Ltd. (CC7), China Consortium Ammonia: Haldor Topose, |
| Process Licensors | Ammonia: Haldor Topose, Denmark CO2 recovery: MHI , Japan Urea Granulation: TKFT, Germany Urea melt: Saipem, Italy |
| Special Characteristics | This Factory is fully environment friendly. It will be the first urea fertilizer factory in Bangladesh where the environmental pollutant Carbon-Di-Oxide (CO2) will be captured from the primary reformer flue gas and the production of urea fertilizer will be increased (about 10%) by using the captured CO2. As a result, there is no carbon emission for preventing Climate Change.
|